Projets en cours

2025


  • DE PRETTO INDUSTRIE MAROC 
    REALISATION DES OUVRAGES CIVILS DE LA CENTRALE THERMIQUE DE SAFI MP1 GTA1
    SAFI
    8 513 028,09 Dh

2023


  • OCP-SIDI DAOUI
    CONSTRUCTION D’UN BASSIN D’EAU A SIDI DAOUI
    OUED ZEM
    5 273 550,00 Dh
  • JORF LASFAR 
    DEPLACEMENT ET MONTAGE DE DEUX DEFENSES AUX QUAIS 6 ET 7 AU PORT DE JORF LASFAR
    EL JADIDA 
    139 680,00 Dh
  • DPE – HOCEIMA
    ACHEVEMENT DES TRAVAUX DE RECONSTRUCTION D’UN OUVRAGE D’ART AU PK36+300 DE LA RR509 PROVINCE HOCEIMA

    14 812 328,46 Dh 

  • ONCF

         TRAVAUX DE REALISATION D’UN DALOT CADRE SOUS VOIE FEREES EN GARE DE SKHIRAT

        8 249 898,00 Dh

2019


  • ONCF
    CONSTRUCTION AU PONT ROUTE 546 AU PK GC171+ 302 DU TRONCON SUD DE LA LIGNE A GRANDE VITESSE TANGER KENITRA
    KENITRA
    12 938 904,00 Dh
  • DPE AL HOCEIMA
    TRAVAUX DE REALISATION DE LA VOIE EXPRESS TAZA AL HOCEIMA SECTION OUED NKOUR-KASSETA SUR 18 KM DE LA RN 2
    AL HOCEIMA
    73 942 598,88 Dh
  • ONCF
    LOT1 : TRAVAUX DE REALISATION DU VIADUC SUR OUM RBIA AU PK 120+228 ET PLATEFORME ENTRE PK 117+800 ET 120+500

     

     

2018


  • ONCF
    CONSTRUCTION AU PONT ROUTE 546 AU PK GC171+ 302 DU TRONCON SUD DE LA LIGNE A GRANDE VITESSE TANGER KENITRA
    KENITRA
    12 938 904,00 Dh
  • DPE AL HOCEIMA
    TRAVAUX DE REALISATION DE LA VOIE EXPRESS TAZA AL HOCEIMA SECTION OUED NKOUR-KASSETA SUR 18 KM DE LA RN 2
    AL HOCEIMA
    73 942 598,88 Dh
  • ONCF
    LOT1 : TRAVAUX DE REALISATION DU VIADUC SUR OUM RBIA AU PK 120+228 ET PLATEFORME ENTRE PK 117+800 ET 120+500

     

     

2017


  • DPE AL HOCEIMA
    TRAVAUX DE REALISATION DE LA VOIE EXPRESS TAZA AL HOCEIMA SECTION OUED NKOUR-KASSETA SUR 18 KM DE LA RN 2
    AL HOCEIMA
    73 942 598,88 Dh
  • ONCF
    LOT1 : TRAVAUX DE REALISATION DU VIADUC SUR OUM RBIA AU PK 120+228 ET PLATEFORME ENTRE PK 117+800 ET 120+500

    Â